Open HVAC jobs and customer deposits at closing — what buyers need to know

DEEP DIVE

Work in Progress at Closing: What Happens to Open Jobs, Deposits, and Pending Installs When an HVAC Business Changes Hands

12 min read Due Diligence Closing Deal Structure

The Business Doesn't Stop on Closing Day

You've negotiated the purchase price. You've run the financials. You've checked the fleet, the staff, the customer reviews. Everything looks good. Then your attorney asks a question nobody prepared you for: "What about the open jobs?"

Every operating HVAC company has work in motion at any given moment. Installs scheduled for next week. Service calls promised to customers. Warranty repairs on the calendar. Equipment sitting on a distributor's loading dock with a PO attached. Deposits collected from homeowners for systems that haven't been installed yet.

In an asset sale — the most common structure for sub-$2M HVAC deals — the buyer acquires assets, not the ongoing business entity. That means every open job, every unfulfilled obligation, and every dollar of customer deposits exists in a grey zone unless the purchase agreement addresses it explicitly.

Most don't.


What "Work in Progress" Actually Means in an HVAC Business

WIP in HVAC isn't an abstract accounting concept. It's real work that real customers are expecting, and it falls into five distinct categories:

1. Scheduled Installations Not Yet Started

The company has signed contracts with customers for system installations — furnaces, air conditioners, heat pumps, mini-splits — scheduled for the days and weeks after closing. The customer paid a deposit. The equipment may or may not be ordered.

What's at stake:

  • Customer deposits of $1,000-$5,000 per installation, typically 30-50% of the job total
  • For a company doing 8-12 installs per month, that's $8,000-$60,000 in deposits for work you haven't done yet
  • If the seller collected those deposits and they're not reflected in the closing adjustments, you're funding the labor and remaining materials out of pocket

2. Partially Completed Installations

An install crew started a job on Tuesday. Closing is Thursday. The ductwork is modified, the old system is removed, but the new unit isn't set and commissioned. The customer's house has no heat.

What's at stake:

  • You inherit a job that's half-done — with a customer who's angry about the disruption and doesn't care about your closing date
  • Materials already on-site (the new equipment, ductwork, fittings) may or may not be included in the asset purchase
  • The original install crew may have done the work differently than your team would, creating a quality and liability question

3. Equipment on Order

The seller has purchase orders with distributors — Carrier, Lennox, Trane, or regional distributors — for equipment tied to customer jobs. Some may be paid for. Some may be on net-30 terms. Some may be on allocation with weeks-long lead times.

What's at stake:

  • Purchase orders don't automatically transfer. The distributor relationship is with the seller's entity, not yours.
  • If you're setting up a new LLC or entity structure, you may need to re-establish credit with every distributor from scratch.
  • Equipment that's already been paid for needs to be accounted for in the purchase price — otherwise the seller takes the equipment and the customer deposit, and you're left explaining the delay.

4. Open Service Calls and Warranty Obligations

The dispatch board has service calls scheduled: maintenance visits, diagnostic calls, warranty repairs. Some are covered by maintenance agreements the customer has already paid for. Some are warranty work the company is obligated to perform at no charge.

What's at stake:

  • Maintenance agreement customers have pre-paid for service they haven't received yet. If the agreement runs January through December and you close in June, six months of service obligations transfer to you with zero revenue.
  • Warranty repairs on systems your predecessor installed are a cost center, not a revenue line. But failing to honor them destroys customer trust and generates the kind of Google reviews that bury a business.

5. Open Permits and Inspections

HVAC installations require permits in most jurisdictions. The seller may have pulled permits for installations that are complete but haven't passed final inspection, or for jobs that are still in progress.

What's at stake:

  • Permits are issued to the contractor of record. If the seller's license is the one on the permit, and the seller's entity is dissolved after closing, the permit may become void.
  • Failed inspections on the seller's work become your problem — you either fix them or explain to the building department why you're abandoning open permits under a different contractor's license.
  • Some jurisdictions require new permits under the new contractor when ownership changes, adding $200-$500 per job in re-permitting costs.

How WIP Creates Post-Close Disputes

The three most common WIP disputes in HVAC acquisitions:

The Deposit Gap

The seller collected $45,000 in customer deposits for 12 scheduled installations. The purchase agreement doesn't mention deposits. The seller considers them "earned revenue" and pockets them at closing. You show up on Day One with 12 customers expecting installations, no deposits to fund the labor, and equipment that may or may not be ordered.

Prevention: The purchase agreement must include a deposit schedule as an exhibit, with a dollar-for-dollar closing adjustment. Every deposit collected for unperformed work reduces the seller's proceeds.

The Material Mismatch

The seller ordered 8 Carrier Infinity systems for upcoming installs at $4,200 each — $33,600 in equipment. The purchase agreement includes "inventory" in the asset list, but doesn't specify whether "inventory" includes equipment ordered for specific customer jobs or just parts on the shelf.

Prevention: Distinguish between three categories in the purchase agreement:

  • Parts inventory: Shelf stock — filters, capacitors, contactors, common repair parts
  • Job-specific equipment: Equipment ordered for and associated with a specific customer contract
  • Work in progress materials: Materials already on-site at a customer's home or partially installed

Each category needs its own valuation and transfer mechanism.

The Warranty Surprise

You discover in week two that the company has 180 outstanding labor warranty obligations from installations completed in the past 12 months. The seller's pricing included a warranty reserve — but that reserve existed as a line item on their internal books, not as an actual cash reserve. You're now responsible for 180 potential warranty calls at $150-$400 each in labor cost, with no funding.

Prevention: Request a warranty register — every installation from the past 24 months with warranty terms and expiration dates. Calculate the expected warranty liability based on historical callback rates (typically 3-8% of installations require warranty service within 12 months). Negotiate a warranty holdback: the seller funds an escrow equal to the estimated liability, drawn down as warranty claims are resolved.


The WIP Audit Checklist

WIP audit checklist — the documents to demand before closing

Before closing, demand these documents and perform these calculations:

From the Seller

  • Complete list of all scheduled installations with customer names, deposit amounts, equipment ordered, and scheduled dates
  • Open service call log — every call on the dispatch board for the next 30 days
  • Active maintenance agreement list with pre-paid months remaining per customer
  • Open purchase orders with all distributors, including payment status
  • Open permit list with permit numbers, addresses, and inspection status
  • Warranty register: all installations from the past 24 months with warranty terms

Your Calculations

  • Total customer deposits collected for unperformed work
  • Total equipment ordered but not yet delivered or installed
  • Pre-paid maintenance agreement months remaining multiplied by monthly cost to service
  • Estimated warranty liability (installations multiplied by historical callback rate multiplied by average warranty cost)
  • Open permits requiring re-permitting under your license: count multiplied by cost per permit

The Closing Adjustment

The sum of these items is your WIP adjustment. It reduces the seller's proceeds dollar-for-dollar for customer deposits and pre-paid obligations, and it creates escrow or holdback accounts for warranty and equipment liabilities.


How to Structure WIP in the Purchase Agreement

Your attorney needs to include these specific provisions. Generic "assumption of liabilities" language is not sufficient:

1. WIP Schedule as an Exhibit

A date-stamped schedule of all work in progress, attached to the purchase agreement and updated at closing. The schedule includes every open job, its status, associated deposits, ordered materials, and scheduled completion date.

2. Deposit Adjustment

All customer deposits for unperformed work are either:

  • Transferred to the buyer as part of working capital (reducing the cash portion of the purchase price), or
  • Applied as a dollar-for-dollar reduction to the purchase price

3. Equipment Transfer

All equipment ordered for customer jobs transfers to the buyer. If equipment is on the seller's credit with a distributor, the seller is responsible for payment and the buyer takes physical possession at closing.

4. Warranty Holdback

An escrow funded by the seller — typically 3-5% of trailing 12-month installation revenue — held for 12-18 months to cover warranty claims on the seller's installations. Any unused balance returns to the seller after the holdback period.

5. Permit Transition Plan

The purchase agreement specifies who is responsible for completing open inspections and what happens if re-permitting is required. Typically, the seller bears the cost of completing inspections on their work, and any re-permitting costs are split or borne by the seller.


What Good Looks Like vs. What Usually Happens

What usually happens: The purchase agreement says "Buyer assumes all customer obligations." The seller walks away with $45,000 in deposits. The buyer spends month one discovering obligations nobody documented. The attorney bills $5,000 in post-close dispute resolution.

What good looks like: The WIP schedule is compiled 30 days before closing. Deposits are quantified and adjusted at the closing table. Equipment on order is listed by PO number with payment status. A warranty holdback of $18,000 sits in escrow. Open permits are listed with an inspection completion plan and timeline. The buyer walks in on Day One knowing exactly what's owed, what's funded, and what's coming.

The difference isn't legal sophistication. It's asking the question before the closing date instead of after it.


The Bottom Line

Your HVAC acquisition due diligence checklist covers financials, fleet, staff, and customer base. But the business you're buying doesn't pause for your closing date. Jobs keep moving. Deposits keep landing. Equipment keeps shipping. Warranty calls keep coming.

WIP is the gap between what the business owes and what the purchase agreement covers. In a typical HVAC company doing $1.5M in annual revenue, that gap can be $50,000-$150,000 — enough to turn a well-structured deal into a cash crisis before you finish your first month.

Ask for the WIP schedule. Run the numbers. Build the adjustments into the purchase agreement. It's not glamorous due diligence. It's the due diligence that determines whether your first month feels like ownership or disaster recovery.